How we work

Five ways to start. One sequence after that.

How much of the formula is yours to define changes with the model. What does not change is the order of work, the sample, and the tests the batch has to pass before it ships.

The five models

Pick by how much you want to control.

ModelWhat you bringWhat we bring
Private label (OEM)Brand, packaging, artwork, shade selectionExisting formula from the library, filled and tested
Full service (ODM)Market, price point, positioningFormula, shade system, packaging sourcing, artwork support
Match a sampleA reference productReverse-engineered formula, matched texture and shade within tolerance
Commissioned formulaA functional brief — finish, wear, claims, price targetNew development from the lab, with stability and compatibility work
Small-batch trialOne shade, one SKU, a launch test30 kg bulk run to validate the product before a full commitment

Most first projects start with the small-batch trial. It is the cheapest way to find out whether a formula survives real customers before you order packaging.

The sequence

What happens, and when.

Days are working days from the point each step's input is complete. Briefs that arrive with a reference product move faster than briefs that arrive as adjectives.

Brief and feasibility

Category, texture, finish, shade count, packaging, target market and price ceiling. We come back with a route and any constraint we cannot meet.

Formula and shade route

Shortlist from the library or open a development. You receive the candidate list with the trade-offs stated, not just the recommended one.

Sample — 3 days

Physical samples plus a specification sheet: fill weight, shade reference, texture targets, packaging compatibility.

Approval and bulk order

Sample sign-off locks the standard. Bulk is scheduled against component lead time, not against our line availability.

Bulk — from 7 days

Filling, assembly, and the five release tests. Fastest cases are single-shade, single-SKU, components already in hand.

Release and shipping

COA and batch test report issued with the goods. Export documentation prepared for your forwarder or ours.

Deliverables

What lands in your inbox, and when.

StageDocuments
QuotationUnit cost basis, bulk minimum, tooling or mould cost if any, lead time
SamplingPhysical sample, specification sheet, shade reference
Pre-productionApproved standard, packaging compatibility note, artwork dieline
Per batchCOA, batch test report, retention sample record
Per formulaINCI list, specification sheet, MSDS
On requestStability report, microbiological report, heavy-metal report

Before you ask

Four things that decide your timeline more than our factory does.

Packaging lead time

A 7-day bulk run means nothing if your compact case arrives in six weeks. Component lead time is usually the real critical path.

Shade count

Each shade is a separate bulk and a separate colour check. Going from 6 shades to 20 changes the cost structure more than the formula does.

Claims and market

Anything you intend to claim on pack has to be supportable in your market. Tell us the market at brief stage, not at shipping.

Reference quality

A physical reference product can be matched. A photo and the word “luxury” cannot. Send the product if you have one.

Start with a brief, not a purchase order.

Tell us the category, the market and the price point. We will tell you what is realistic before you spend anything.